The Hughes Road Transmission Replacement and Litton Road Extension project involves two separate portions. The first portion includes the replacement of 1,240 feet of existing 20-inch diameter steel pipe within Hughes Road. The pipe is over 55 years old, has had numerous leaks, and is at the end of its useful life. The pipe is a transmission main critical for providing downstream flows to the system. A portion of the water system connected to a six-inch water line will be eliminated by connecting existing services to the new 20-inch main. The second portion of the project is to extend and connect two ends of the District’s water system, a 600-foot long, 10-inch diameter pipe connecting the Litton Road pipe segment to the one ending to the southwest on private properties. This second pipe will enhance the District’s water system by creating a loop for flow. The project will provide better operational service for treated water customers.
The project is in the 2024 Capital Improvement Program and is currently in the design phase.