The North Auburn Highway 49 Project involves the construction of approximately 4,100 feet of water transmission main pipeline for the District. The proposed new water transmission main will connect several of the District’s existing water distribution system loops to provide the desired fire flow capacity improvements. The Project is located along Highway 49 north of Auburn in Placer County, California. The proposed 16-inch water transmission line runs along the east side of Highway 49 between Locksley Lane and Quartz Drive, Phase 1, and along the west side of Highway 49 between Education Street and Cottage Drive, Phase 2.

Phase 1 is scheduled for construction Summer/Fall 2012.