Caroline Lane / Winter Moon Way Water Line Extension Project

Caroline Winter Moon Project

Click to enlarge

The Proposed Project is located on Banner Mountain in Nevada City beginning at the intersection of Banner Lava Cap Road and Caroline Lane. Under the NID’s District Financed Water Line Extension Project, the Project would provide treated water to property owners that have requested service along Caroline Lane and Winter Moon Way.

The Project would include the construction and operation of an approximately 2,100-foot long 8-inch waterline that runs along Caroline Lane and Winter Moon Way. It would connect to an existing 12-inch water main at the intersection of Caroline Lane and Banner Lava Cap Road. The pipeline would be constructed within the existing road and roadway shoulder and include air release valves, blow-off valves, fire hydrants, and metered service assemblies. It would be installed below ground with a minimum 30 inches of cover in an approximately 4-foot deep by 2.5-foot wide trench.

The NID prepared a Draft Initial Study/Mitigated Negative Declaration and was circulated for 30 days for public review. Comments for the IS/MND are due by August 14, 2014.

The NID plans to construct the project in the Fall of 2014.

Switch to our mobile site