Banner Cascade Pipeline Project Photo Gallery

Raw water pipes ready for installation.

Raw water pipe being lowered into the trench.

The raw water pipeline trench is approximately fourteen feet deep.

Phase one of restoration includes slope regrading, jute netting, and hydroseeding.

Mutiple construction activities may occur simultaneously.
