Banner Cascade Pipeline Project Construction Drawings
- Construction Drawings by Neighborhood
- Banner Lava Cap Road to E. George WTP (1.58 MB PDF)
- Red Gate Road (2.36 MB PDF)
- Overland, Madrone Forest Drive to Red Gate Road (6.5 MB PDF)
- Madrone Forest Drive (2.1 MB PDF)
- Overland between Madrone Forest Drive and the Airport (2.54 MB PDF)
- Airport and Loma Rica Water Treatment Plant (8.68 MB PDF)
- Lee Lane (5.26 MB PDF)
- Idaho Maryland Road (4.65 MB PDF)
- Banner Lava Cap Road between Idaho Maryland Road and Wings of Morning Drive (3.59 MB PDF)
- Wings of Morning Drive (11.45 MB PDF)
- Opalite Way/Overland/Snow Mountain Flow Control Facilities (5.6 MB PDF)
- Red Dog Cross Road, Lola’s Echo Road, Oak Ridge Road/Clipper Creek Siphon Replacement (6.0 MB PDF)
- General Construction Drawings
- General (1.2 MB PDF)
- General Civil (5.1 MB PDF)
- Cathodic Protection Schedules (2.3 MB PDF)
- Traffic (6.5 MB PDF)
- Construction Safety Plan for Nevada County Airport (1.7 MB PDF)
- Structural (2 MB PDF)
- General Mechanical (1 MB PDF)
- Mechanical (1.1 MB PDF)
- Electrical (1 MB PDF)
- Instrumentation & Control (672 KB PDF)
- Fiber Optic Conduit (239 KB PDF)
- Construction Drawings (Combined) (52 MB PDF)